Piles Complete

After much pounding, All the piles are in the ground all the way down to bedrock.  As you can see from the photo, the concrete has been cut off above the surface exposing the many strands of rebar within the pile.  Our team is now working on capping the sistered piles and laying out the concrete beams.  The exposed rebar will be used to tie the caps, beams, and piles together so that they become one cohesive structure to support the building.